Skip to content
Disruptive Real Estate

Emaar Properties · Mina Rashid

Clearpoint

  • Apartments
  • Duplexes
Starting from
AED 1,549,888
Bedrooms
1–3 BR
Size
806–1,758 sqft
Payment plan
On request
Completion
19%
Available
478 / 478
Handover
Q3 2027

About Clearpoint

Off-Plan Apartments in Mina Rashid

Clearpoint is a collection of 478 apartments across three midrise buildings, each built to a ground plus 10 storeys plus roof configuration, within Mina Rashid, Dubai's waterfront district built around a 430-berth superyacht marina. Construction started in November 2023 and is currently at 18.76% completion, placing the project in an active build phase rather than early off-plan release.

Unit types cover 1, 2 and 3-bedroom apartments, with select 3-bedroom units configured as duplexes for buyers seeking dual-level layouts. The building split across three towers, Clearpoint Building 1, 2 and 3, gives the development a low-rise scale unusual for a marina-facing project of this size.

Architecture and Layouts

The three towers use a concrete structure with block construction, finished internally and externally to a residential specification. Glass facades and aluminium detailing define the exterior, while a raised central podium links the buildings above ground-floor parking.

One-bedroom units are laid out with open kitchens and built-in wardrobes. Two-bedroom units include a master suite with en-suite bathroom, walk-in wardrobe and balcony access, plus a second bedroom with built-in storage. Three-bedroom units, including the duplex options, add a larger living area, en-suite master and private terraces on the duplex layouts.

Amenities and Community Layout

Clearpoint sits beside green landscaping on three sides, with a Pocket Park at the community's centre and the Canal Pool within walking distance. The raised podium level houses a swimming pool and shared outdoor space, while ground-floor parking is dedicated for residents.

The development is positioned near Central Avenue and a short walk from the Marina Promenade, putting shops, cafes and dining within reach without relying on a car for daily errands.

Developer Track Record

Clearpoint is developed under Emaar Properties, which reported a market capitalisation of AED 51.8 billion and revenue of AED 24.9 billion for FY2022, with more than 85,000 residential units delivered to date and a further 27,000 units under development across 12-plus international markets.

That scale gives buyers a level of delivery certainty on a project still under construction, backed by an established developer rather than a newer market entrant.

Key highlights

  • 478 apartments across 3 buildings, each G+10+Roof
  • 1, 2 and 3-bedroom units, including 3-bedroom duplexes
  • Developed by Emaar Properties, delivered 85,000+ units globally
  • Within Mina Rashid, 20 minutes from Dubai International Airport
  • Central podium with pool, gym and landscaped park
  • Escrow held with Emirates NBD Bank

Why this project

  • Low-rise apartments and duplexes in Mina Rashid's marina district, developed by Emaar with 478 units across three buildings.

Amenities

  • Canal Pool
  • Swimming Pool
  • Gym
  • Tennis Courts
  • Community Park
  • Boardwalk Promenade
  • Nursery
  • Barbeque Area
  • Pocket Park

Location

Connectivity from Mina Rashid

Mina Rashid is roughly 22 minutes from Downtown Dubai and Al Sabkha Gold Souq, 20 minutes from Dubai International Airport and 32 minutes from Dubai Marina, per the developer's stated drive times. The location sits within one of Dubai's older waterfront neighbourhoods, close to the Etihad Museum, Heritage Village and the former residence of Sheikh Saeed Al Maktoum.

Residents also have access to a ferry station within the wider Rashid Yachts & Marina masterplan, offering a water-based alternative into the city.

Neighbourhood Character

The surrounding masterplan combines the marina's 430 wet berths for yachts up to 100 metres, a promenade of restaurants and boutique retail, and heritage attractions from Mina Rashid's former life as a working port. Clearpoint's position within the community gives residents proximity to the QE2 Hotel and the marina promenade without being directly on the waterfront.

Project information

Developer
Emaar Properties
Location
Mina Rashid
Handover
Q3 2027
Total units
478
RERA Escrow
Emirates NBD Bank (PJSC)
DLD Project #
2743

DLD-verified today

Project intelligence

Live DLD data

Real Dubai Land Department transactions and rent contracts — not developer marketing.

Clearpoint — handover progress

19%
LaunchNov 2023
Today15mo to handover
HandoverQ3 2027

Resale at Clearpoint

21 transactions · last 12 months

Avg / sqft
AED 1,918
Avg price
AED 2,265,756
Year-on-year
+2.3%
Range
AED 1,549,888AED 3,700,000
By unit size
  • 1 BRAED 1,947/sqft10 sales
  • 2 BRAED 1,833/sqft6 sales
  • 3 BRAED 1,964/sqft5 sales

Mina Rashid market

1 br · 345 sales analyzed

High activity
Avg / sqft
AED 2,751
Sales last 6 mo
85
Year-on-year
-2.3%
Off-plan vs ready
39.9% pricier
AED 2,763 vs 1,975
4.5%

Indicative gross yield

At the starting price of AED 1,549,888, typical rent for a 1 br in Mina Rashid (AED 70,000/year, ~AED 5,800/month) implies a 4.5% gross yield.

Based on 22 DLD rent contracts in the last 12 months. Gross yield excludes service charges, vacancy and management fees.

Source: Dubai Land Department open data. Analytics are computed from registered transactions and rent contracts; figures are indicative and not a guarantee of future performance.

Bedrooms available at Clearpoint

Frequently asked questions about Clearpoint

What is Clearpoint and where is it located?

Clearpoint is a residential development of 478 apartments across three midrise buildings in Mina Rashid, Dubai's marina district built around Rashid Yachts & Marina.

Who is the developer behind Clearpoint?

Clearpoint is developed by Emaar Properties, one of the largest real estate developers globally by residential units delivered.

What unit types are available at Clearpoint?

Clearpoint offers 1, 2 and 3-bedroom apartments, with select 3-bedroom units built as duplexes with private terraces.

What is the construction status of Clearpoint?

As of the latest DLD data, Clearpoint is 18.76% complete, having started construction in November 2023.

What amenities does Clearpoint offer residents?

The development includes a swimming pool, gym, tennis courts, community park, boardwalk promenade, nursery and barbeque area around a landscaped central podium.

How far is Clearpoint from Dubai International Airport?

Mina Rashid is approximately 20 minutes from Dubai International Airport, and around 22 minutes from Downtown Dubai.

Which bank holds the escrow account for Clearpoint?

The project's escrow account is held with Emirates NBD Bank (PJSC), as registered with the Dubai Land Department.

Get the Clearpoint brochure

Floor plans, payment plans and current availability — direct from Emaar Properties via Disruptive Real Estate. No inflated commissions, no spam. One business-day reply.

By submitting, you agree to be contacted by Disruptive Real Estate (RERA ORN 1167819) about Clearpoint. We never share your details.

More off-plan projects in Mina Rashid

View all Mina Rashid off-plan projects →

Last updated · Browse all Dubai off-plan projects

CallWhatsApp