Emaar Properties · Dubai Creek Harbour
Silva is a single residential tower in Dubai Creek Harbour, configured as basement plus ground plus two podium levels plus 47 residential floors, delivering 434 homes in total. The building massing is designed to maximize views across the Creek, the skyline, and the landscaped surrounds of the Greengate community hub directly below. Private balconies and panoramic terraces are integrated into every unit type, framing creek and city sightlines as a core architectural feature rather than an afterthought.
Interiors follow a restrained palette of earthy tones across expansive living areas that open from grand lobbies. The residential mix spans 1, 2 and 3-bedroom apartments alongside 3-bedroom townhouses, giving the building a range of typologies suited to both owner-occupiers and investors.
Silva sits within Greengate, a low-density precinct inside Dubai Creek Harbour that prioritizes green space over built coverage. Sprawling gardens and landscaped links connect the tower to a Central Park, a central plaza, multi-sport courts, a full football field, a running track, a skate park, a climbing wall, and lawn and BBQ areas. Retail and food-and-beverage outlets are embedded within the precinct, so daily errands and casual dining remain walkable.
The amenity programming is deliberately active: fitness zones, yoga spaces, and the multi-sport court are positioned to encourage daily use rather than functioning as showcase facilities. Creek Beach and Creek Promenade, two of Dubai Creek Harbour's established public attractions, are within the broader community and accessible on foot or by short drive.
Dubai Creek Harbour is a master-planned waterfront district developed by Emaar Properties, ranked by market capitalisation among the largest real estate companies outside China. The wider community borders the Ras Al Khor Wildlife Reserve, a protected wetland known internationally for its flamingo population, giving the district a permanent green buffer that cannot be built over. This combination of regulated natural land and Emaar's scale of delivery underpins the long-term supply dynamic for apartments in Dubai Creek Harbour.
Silva's DLD registration records a project start date of August 2025 and a completion target of September 2029, placing it firmly in the off-plan window where capital appreciation has historically been strongest across Emaar's Creek Harbour launches. With 437 registered units across a single building, the project is mid-scale by district standards, which tends to support resale liquidity.
Dubai Creek Harbour sits approximately 10 minutes by road from Downtown Dubai and 15 minutes from Dubai International Airport, based on the developer's stated drive times. The planned Blue Line Metro extension is set to add a station serving the district, which would link it directly to both existing Red and Green Line networks. Until the Blue Line opens, the community is served by road via Ras Al Khor, with bus connections available to existing metro stops.
Silva occupies the Greengate precinct of Dubai Creek Harbour, a waterfront district that shares its eastern boundary with the Ras Al Khor Wildlife Reserve. The broader community includes Creek Beach, Creek Promenade, Creek Marina, a Harbour Promenade, a Viewing Point, and a Central Park, giving residents a range of outdoor destinations within walking distance. Deira and the Dubai Frame are also nearby to the north and west respectively.
Downtown Dubai and Burj Khalifa are reachable in around 10 minutes by car, Dubai International Airport in roughly 15 minutes, and Al Maktoum International Airport in approximately 40 minutes. The forthcoming Blue Line Metro is planned to serve Dubai Creek Harbour directly, which will add a car-free route to Downtown, Business Bay, and onward connections across the city's existing metro network.
DLD-verified today
Real Dubai Land Department transactions and rent contracts — not developer marketing.
396 transactions · last 12 months
1 br · 1,808 sales analyzed
At the starting price of AED 1,756,050, typical rent for a 1 br in Dubai Creek Harbour (AED 90,000/year, ~AED 7,500/month) implies a 5.1% gross yield.
Based on 500 DLD rent contracts in the last 12 months. Gross yield excludes service charges, vacancy and management fees.
Source: Dubai Land Department open data. Analytics are computed from registered transactions and rent contracts; figures are indicative and not a guarantee of future performance.
Floor plans, payment plans and current availability — direct from Emaar Properties via Disruptive Real Estate. No inflated commissions, no spam. One business-day reply.
Last updated · Browse all Dubai off-plan projects