Skip to content
Disruptive Real Estate

Emaar Properties · Emaar Beachfront

Sunrise Bay

  • Apartments
Starting from
AED 2,000,000
Bedrooms
1–4 BR
Size
670–2,150 sqft
Payment plan
On request
Completion
Ready
Available
On request
Handover
2021-10-31

About Sunrise Bay

Twin Tower Design

Sunrise Bay is a twin tower development of 26 storeys each, positioned along the waterfront within Emaar Beachfront, a collection of 27 residential towers built on a man-made peninsula between Dubai Marina and Palm Jumeirah. The project comprises 457 residential apartments and 4 retail units across its two towers and connecting podium, totalling 461 units within 3 buildings on record.

The two towers are linked by a shared podium deck that houses sports facilities and private parking, giving residents of both blocks access to a common set of amenities at ground level. Apartment layouts range from 670 sq. ft. for 1-bedroom homes to 2,150 sq. ft. for 4-bedroom residences, with unit orientation planned to maximise views of the marina and open water.

Interior Design & Finishes

Interiors draw on a material palette of creams, greys and white tones, with finishes intended to read as understated rather than ornamental. Master bedrooms are designed around a simple, textured aesthetic, while family bathrooms use minimal forms and sleek surfaces finished in a mix of bright and neutral colours.

Facades reference yachting and loft-style architecture, with panoramic balconies extending the visual depth of each unit. The exterior material composition is described by the developer as evoking the fibreglass hulls of superyachts, tying the building's appearance to its waterfront setting.

Developer Track Record

Sunrise Bay is developed by Emaar Properties, the group behind Burj Khalifa, The Dubai Mall and master communities including Downtown Dubai, Dubai Marina, Arabian Ranches and Dubai Hills Estate. Emaar Beachfront represents the developer's beachfront living concept, encompassing roughly 10,000 residential units and 1.5 km of private beach across the full masterplan.

Construction on Sunrise Bay ran from June 2018 to completion in October 2021, and the project is now handed over and fully finished, with the escrow account held at Abu Dhabi Commercial Bank.

Amenities & Podium Facilities

The podium deck connecting the two towers includes an infinity pool positioned to overlook the Dubai Marina skyline, along with sports facilities and dedicated parking. Ground-floor retail and healthcare facilities serve residents directly within the building, reducing reliance on off-site errands.

Beyond the building itself, residents draw on the wider Emaar Beachfront offer, including a boulevard of restaurants, cafes and retail outlets along the promenade fronting 750 metres of beach on either side of the development.

Key highlights

  • 26-storey twin towers on Emaar Beachfront peninsula
  • 461 units across podium and 2 towers, handed over October 2021
  • Units from 670 sq ft (1-bed) to 2,150 sq ft (4-bed)
  • Podium infinity pool overlooking Dubai Marina skyline
  • 750m of beach access on either side of the towers
  • Fully completed and ready to move in

Why this project

  • Twin waterfront towers on Emaar Beachfront with direct podium access to 750m of private beach on each side.

Amenities

  • Infinity pool
  • podium sports facilities
  • private parking
  • ground-floor retail
  • healthcare facilities at ground level
  • beachfront access
  • boulevard dining and cafes
  • marina views
  • yacht club proximity

Location

Access & Connectivity

Emaar Beachfront sits between Dubai Marina and the newer districts of Dubai South, giving Sunrise Bay residents direct access to Sheikh Zayed Road. The location places the community roughly 20 minutes from Dubai International Airport and 45 minutes from Al Maktoum International Airport by the developer's estimates.

The peninsula's position also puts Dubai Marina's beaches, yacht clubs, malls and dining strip within short reach, alongside Emaar Beachfront's own 1.5 km beach and boulevard of retail and restaurants.

Surrounding Neighbourhood

Dubai Harbour, the immediate address for Sunrise Bay, sits adjacent to Dubai Marina and forms part of the broader Emaar Beachfront peninsula. The area combines a working marina and yacht destination with the residential towers of the Emaar development, giving the location a maritime rather than purely urban character compared to inland districts.

Project information

Developer
Emaar Properties
Location
Emaar Beachfront
Handover
2021-10-31
Total units
461
RERA Escrow
Abu Dhabi Commercial Bank
DLD Project #
2025

DLD-verified today

Project intelligence

Construction timeline. DLD resale and rent analytics will populate as this community matures.

Sunrise Bay — handover progress

100%
LaunchJun 2018
Today0mo to handover
Handover2021-10-31

Source: Dubai Land Department open data. Analytics are computed from registered transactions and rent contracts; figures are indicative and not a guarantee of future performance.

Bedrooms available at Sunrise Bay

Frequently asked questions about Sunrise Bay

Is Sunrise Bay ready or off-plan?

Sunrise Bay is fully completed and handed over. Construction ran from June 2018 to October 2021, and the project is now 100% finished.

Who developed Sunrise Bay?

Sunrise Bay was developed by Emaar Properties as part of its Emaar Beachfront masterplan.

How many units does Sunrise Bay have?

The project comprises 457 residential apartments and 4 retail units, totalling 461 units across a podium and two 26-storey towers.

What unit sizes are available at Sunrise Bay?

Apartments range from 670 sq. ft. for 1-bedroom units to 2,150 sq. ft. for 4-bedroom units.

Where is Sunrise Bay located?

Sunrise Bay is located in Dubai Harbour, within the Emaar Beachfront peninsula between Dubai Marina and Palm Jumeirah.

What amenities does Sunrise Bay offer?

The podium deck connecting the two towers includes an infinity pool overlooking Dubai Marina, sports facilities, private parking and ground-floor retail and healthcare units.

How far is Sunrise Bay from Dubai's airports?

The developer states approximately 20 minutes to Dubai International Airport and 45 minutes to Al Maktoum International Airport.

Get the Sunrise Bay brochure

Floor plans, payment plans and current availability — direct from Emaar Properties via Disruptive Real Estate. No inflated commissions, no spam. One business-day reply.

By submitting, you agree to be contacted by Disruptive Real Estate (RERA ORN 1167819) about Sunrise Bay. We never share your details.

Last updated · Browse all Dubai off-plan projects

CallWhatsApp