Skip to content
Disruptive Real Estate

Emaar Properties · Dubai Creek Harbour

Summer at Creek Beach

  • Apartments
Starting from
AED 900,000
Bedrooms
1–3 BR
Size
332–1,700 sqft
Payment plan
On request
Completion
Ready
Available
On request
Handover
2023-03-07

About Summer at Creek Beach

Dubai Creek Harbour Apartments

Summer is a completed residential development within Dubai Creek Harbour, comprising four buildings and 305 apartments across configurations of 1, 2 and 3 bedrooms. Building 1 rises to ground plus mezzanine plus 11 floors plus roof with 106 units, while Buildings 2 to 4 range from 6 to 9 floors above the mezzanine level, housing 57, 73 and 64 units respectively.

The project was developed by Emaar Properties, which has delivered more than 45,900 residential units since 2002 and holds a land bank exceeding 167 million square metres across its portfolio. Summer follows earlier phases at Creek Beach, including Breeze, Sunset and Bayshore, extending the same beachfront residential format.

Construction ran from August 2019 to March 2023, and the project reached 100% completion, meaning units are ready for immediate occupancy rather than under construction.

Design and Layout

Apartments at Summer are oriented to capture views of Dubai Creek Tower, landscaped courtyards and pedestrian streets within the surrounding community. Interiors are finished to a standard consistent with Emaar's other Creek Beach releases, with attention to natural light and window placement across living areas.

The buildings sit around shared green courtyards rather than a single central podium, spreading amenity space across the four blocks and giving residents multiple access points to on-site facilities.

Amenities and Family Facilities

Residents have access to a community pool and kids' pool, a fully-equipped gym, barbecue facilities, an outdoor play area and a multi-purpose community room. Some of these facilities are shared with residents of the neighbouring Bayshore development.

Daily needs are covered within walking distance: a 1,200 sqm supermarket, a polyclinic, an on-site nursery, and retail and dining outlets sit close to the towers, reducing reliance on car trips for routine errands.

Dubai Creek Harbour Property Investment

Dubai Creek Harbour spans 6 square kilometres and is planned to eventually house a residential population of 200,000, supported by 700,000 sqm of parks and open space, 940,000 sqm of retail GFA and 23 hotels. The scale of the master plan underpins long-term demand for completed stock like Summer, which is already handed over and generating rental income rather than exposed to construction risk.

As a finished asset with a Mashreq Bank escrow account on record, Summer sits at a different risk profile than typical off plan projects still under construction, appealing to investors prioritising immediate occupancy or rental yield over payment-plan leverage.

Key highlights

  • 305 apartments across 4 buildings, fully completed and handed over
  • 1, 2 and 3-bedroom layouts with views of Dubai Creek Tower
  • Direct access to Creek Beach and Creek Canal
  • 5-minute walk to Creek Marina, dedicated metro station nearby
  • Developed by Emaar Properties, part of the Creek Beach series
  • Close to Ras Al Khor Wildlife Sanctuary and Dubai Square

Why this project

  • Completed beachfront apartments in Dubai Creek Harbour, 300m from Creek Beach with metro access and views of Dubai Creek Tower

Amenities

  • Community pool
  • kids' pool
  • fully-equipped gym
  • barbecue facilities
  • outdoor play area
  • multi-purpose community room
  • on-site nursery
  • polyclinic access
  • 1

Location

Creek Beach Connectivity

Summer sits roughly 100 metres from Creek Beach itself and about a 5-minute walk from Creek Marina, with direct pedestrian access to the beach and Creek Canal. A dedicated Dubai Creek Harbour metro station serves the wider community, alongside road access via Sheikh Zayed Bin Hamdan Al Nahyan Street and a 5-minute link to Emirates Road.

Burj Khalifa is roughly 10 minutes away by car, Dubai International Airport around 15 minutes, and Dubai Creek Tower is within a 5-minute reach, positioning the project close to the emirate's landmark cluster without being inside the downtown core.

Nearby Amenities and Wildlife Sanctuary

The development is in close proximity to the Ras Al Khor Wildlife Sanctuary and a short stroll from Dubai Square, a retail district planned to include the Middle East's largest Chinatown across three levels. The waterfront Vida Hotel offers additional dining options within walking distance.

For residents without a car, the metro connection makes commuting into central Dubai straightforward, while Creek Marina's yacht club and boardwalk, roughly 5 minutes away, add a leisure dimension distinct from the retail-focused areas nearby.

Project information

Developer
Emaar Properties
Location
Dubai Creek Harbour
Handover
2023-03-07
Total units
305
RERA Escrow
Mashreq Bank
DLD Project #
2150

DLD-verified today

Project intelligence

Live DLD data

Real Dubai Land Department transactions and rent contracts — not developer marketing.

Summer at Creek Beach — handover progress

100%
LaunchAug 2019
Today0mo to handover
Handover2023-03-07

Resale at Summer at Creek Beach

11 transactions · last 12 months

Avg / sqft
AED 2,122
Avg price
AED 1,749,545
Year-on-year
+4.2%
Range
AED 650,000AED 2,900,000
By unit size
  • 1 BRAED 2,222/sqft9 sales
  • 3 BRAED 1,923/sqft2 sales

Dubai Creek Harbour market

1 br · 1,676 sales analyzed

High activity
Avg / sqft
AED 2,568
Sales last 6 mo
572
Year-on-year
-0.2%
Off-plan vs ready
9.3% pricier
AED 2,628 vs 2,404
10.0%

Indicative gross yield

At the starting price of AED 900,000, typical rent for a 1 br in Dubai Creek Harbour (AED 90,000/year, ~AED 7,500/month) implies a 10.0% gross yield.

Based on 500 DLD rent contracts in the last 12 months. Gross yield excludes service charges, vacancy and management fees.

Source: Dubai Land Department open data. Analytics are computed from registered transactions and rent contracts; figures are indicative and not a guarantee of future performance.

Bedrooms available at Summer at Creek Beach

Frequently asked questions about Summer at Creek Beach

Is Summer at Creek Beach ready to move in?

Yes. The project reached 100% completion, with construction running from August 2019 to handover in March 2023, so all 305 units are ready for immediate occupancy.

How many units and buildings does Summer have?

The development comprises 4 buildings with a combined 305 residential units: 106 in Building 1, 57 in Building 2, 73 in Building 3 and 64 in Building 4.

How do you get to Dubai Creek Harbour by metro?

Dubai Creek Harbour has its own dedicated metro station serving the community, putting Summer within easy reach of the rest of the city without relying on a car.

How far is Summer from Creek Beach and Creek Marina?

Summer has direct access to Creek Beach and Creek Canal, and is roughly a 5-minute walk from Creek Marina and its yacht club.

Who developed Summer at Creek Beach?

Summer was developed by Emaar Properties, following earlier successful Creek Beach releases including Breeze, Sunset and Bayshore.

Is Dubai Creek Harbour a good investment?

Dubai Creek Harbour is a 6-square-kilometre master plan targeting a 200,000 residential population, with 940,000 sqm of retail GFA and 23 hotels planned, supporting long-term demand for completed stock such as Summer.

What amenities are available at Summer?

Residents have access to a community pool, kids' pool, gym, barbecue areas, an outdoor play area and a multi-purpose community room, some shared with the neighbouring Bayshore development, plus a nearby supermarket, polyclinic and nursery.

Get the Summer at Creek Beach brochure

Floor plans, payment plans and current availability — direct from Emaar Properties via Disruptive Real Estate. No inflated commissions, no spam. One business-day reply.

By submitting, you agree to be contacted by Disruptive Real Estate (RERA ORN 1167819) about Summer at Creek Beach. We never share your details.

More off-plan projects in Dubai Creek Harbour

View all Dubai Creek Harbour off-plan projects →

Last updated · Browse all Dubai off-plan projects

CallWhatsApp